Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Monitor well installation at K-1407-B and K-1407-C surface impoundments at the Oak Ridge Gaseous Diffusion Plant

Technical Report ·
OSTI ID:6378265

In October 1985, Geraghty and Miller, Inc. (G and M), was retained to design and install monitor wells in the uppermost aquifer, in the vicinity of two surface impoundments, in accordance with EPA regulations for interim status. This report describes the details of well construction and summarizes the geologic and hydrologic observations made during the drilling. Suggestions for sampling and analysis of water from the upper aquifer are included.

Research Organization:
Geraghty and Miller, Inc., Oak Ridge, TN (USA)
DOE Contract Number:
AC05-84OT21400
OSTI ID:
6378265
Report Number(s):
K/SUB-85-22224/3; ON: DE87011802
Country of Publication:
United States
Language:
English