Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The rapid installation of a large North Sea jacket over a subsea template

Conference · · Proc., Annu. Offshore Technol. Conf.; (United States)
OSTI ID:6371296
This paper describes the design evolution and offshore operations that led to the rapid installation of a large North Sea jacket over a subsea template. The basic design philosophy, the supporting engineering studies, the preinstallation preparations and the actual jacket installation are addressed. Conclusions drawn from these experiences are offered for the benefit of similar operations.
Research Organization:
Mobil North Sea Ltd.
OSTI ID:
6371296
Report Number(s):
CONF-8405208-
Conference Information:
Journal Name: Proc., Annu. Offshore Technol. Conf.; (United States) Journal Volume: 2
Country of Publication:
United States
Language:
English

Similar Records

Bumper pile design for mating platform and subsea drilling template
Conference · Sun May 01 00:00:00 EDT 1983 · Offshore Technol. Conf.; (United States) · OSTI ID:5302664

Bumper-pile design for mating platform and subsea drilling template
Journal Article · Thu May 01 00:00:00 EDT 1986 · SPE (Society of Petroleum Engineers) Product. Eng.; (United States) · OSTI ID:5513191

Subsea template, pipeline anchor Troll-Oseberg gas-injection scheme in Norwegian North Sea
Journal Article · Sun Jan 17 23:00:00 EST 1988 · Oil Gas J.; (United States) · OSTI ID:5339649