Computer-aided design drafting/manufacturing (CADD/M) facility preparation
Computer-Aided Design, Drafting and Manufacturing (CADD/M) equipment requires careful facilities preparation before installation takes place. This paper presents what a company should consider to ensure a proper installation. This includes consideration of working conditions. To get the most out of the system, the operators must be provided with a relaxed, comfortable environment, free from noise and other distractions. Such things as temperature requirements, lighting, power, security and fire protection are discussed. Also, future expansion needs are considered so that major construction will not be required for future years. Advanced planning in these areas is needed to ensure successful implementation of a CADD/M system. This will lead to considerable cost savings, and in the long run, improve the scheduling for an entire project, from initial design to final production. This careful preparation will minimize unplanned events and problem areas. These are ambitious goals but easily realized if a logical and rational plan is adopted in the same manner as that used in a typical development program.
- Research Organization:
- Lawrence Livermore National Lab., CA (USA)
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 6350290
- Report Number(s):
- UCRL-84964; CONF-8009151-4
- Country of Publication:
- United States
- Language:
- English
Similar Records
Facility management of computer-aided design, drafting/manufacturing systems (CADD/M)
Use of CADD (Computer Aided Drafting and Design) in a construction setting