skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Plan for support of large-plant (post-CRBR) needs in large-leak sodium-water reaction area

Technical Report ·
DOI:https://doi.org/10.2172/6347928· OSTI ID:6347928

Work in the large leak test and analysis area of steam generator development has been carried out at GE-ARSD under 189a SG037 since 1973. The currently planned master schedule for the SG037 program is shown. Principal activities are the large leak testing program being carried out at the Large Leak Test Rig and the analysis methods development. The plan for supporting the large plant (post-CRBR) needs in the large leak sodium-water reaction area is outlined. Most of the needs will be answered in the current SG037 large leak program. (DLC)

Research Organization:
General Electric Co., Sunnyvale, CA (USA). Advanced Reactor Systems Dept.
DOE Contract Number:
AT03-76SF70030
OSTI ID:
6347928
Report Number(s):
DOE/SF/70030-T19; ON: DE81025232; TRN: 81-012128
Country of Publication:
United States
Language:
English