Title: Multilateral installation from a floating rig

Abstract

The Troll Olje gas province is approximately 100 km northwest of Bergen, Norway, in the Norwegian sector of the North Sea at a water depth of approximately 315 to 340 m. Troll Olje is part of the Troll gas field, where Norsk Hydro is responsible for developing two areas with thin oil rims. Before spudding the multilateral well described in this paper, 17 wells had been drilled and completed in the Troll Olje oil province. The multilateral-well concept was introduced in the gas province primarily to increase the drainage area for each well. When producing from two separate laterals, a lower drawdown pressure exists throughout the horizontal section. Therefore, gas coning is less likely to occur, and higher production rates can be sustained for a longer period of time. In addition, cost savings are substantial because of reduced well-construction time for each horizontal reservoir-drainage section and because of the reduced number of completion strings, subsea wellheads, and pipelines required for total field development. The full-length paper details design, development, testing, and installation of the first successful multilateral well installed from a floating rig offshore Norway. The paper gives a synopsis.

Publication Date:
OSTI Identifier:
634599
Resource Type:
Journal Article
Resource Relation:
Journal Name: JPT, Journal of Petroleum Technology; Journal Volume: 50; Journal Issue: 7; Other Information: PBD: Jul 1998
Country of Publication:
United States
Language:
English
Subject:
03 NATURAL GAS; NORTH SEA; OFFSHORE PLATFORMS; NATURAL GAS FIELDS; DIRECTIONAL DRILLING; RESERVOIR ENGINEERING; NATURAL GAS WELLS; WELL COMPLETION

Citation Formats

NONE. Multilateral installation from a floating rig. United States: N. p., 1998. Web.
NONE. Multilateral installation from a floating rig. United States.
NONE. 1998. "Multilateral installation from a floating rig". United States. doi:.
@article{osti_634599,
title = {Multilateral installation from a floating rig},
author = {NONE},
abstractNote = {The Troll Olje gas province is approximately 100 km northwest of Bergen, Norway, in the Norwegian sector of the North Sea at a water depth of approximately 315 to 340 m. Troll Olje is part of the Troll gas field, where Norsk Hydro is responsible for developing two areas with thin oil rims. Before spudding the multilateral well described in this paper, 17 wells had been drilled and completed in the Troll Olje oil province. The multilateral-well concept was introduced in the gas province primarily to increase the drainage area for each well. When producing from two separate laterals, a lower drawdown pressure exists throughout the horizontal section. Therefore, gas coning is less likely to occur, and higher production rates can be sustained for a longer period of time. In addition, cost savings are substantial because of reduced well-construction time for each horizontal reservoir-drainage section and because of the reduced number of completion strings, subsea wellheads, and pipelines required for total field development. The full-length paper details design, development, testing, and installation of the first successful multilateral well installed from a floating rig offshore Norway. The paper gives a synopsis.},
doi = {},
journal = {JPT, Journal of Petroleum Technology},
number = 7,
volume = 50,
place = {United States},
year = 1998,
month = 7
}
  • In early March 1998, the United States government approved a plan in cooperation with the United Kingdom and Georgian governments to rapidly retrieve and transport about 4.3 kilograms of enriched uranium. This material consisted largely of highly enriched uranium and a small amount of low-enriched uranium fresh fuel, as well as about 800 grams of HEU/LEU-based spent fuel from a shutdown IRT-M research reactor on the outskirts of Tbilisi in Georgia, a former Soviet republic. A technical team led by DOE consisted of HEU handling, packing and transportation experts from the Oak Ridge Y-12 Plant, managed and operated by Lockheedmore » Martin Energy Systems, and spent fuel handling and transportation experts from NAC International in Norcross, Georgia, U.S.A. The team was part of an interagency task force formed with Department of Defense military personnel under US European Command and headed by a senior official from the Department of State. The operation was executed in full cooperation with the government of the Republic of Georgia and the staff at the institute of Physics. In April of 1998, the fresh fuel was repacked in US-supplied 6M-2R containers [USA/0002/B(U)F] and the spent fuel was repacked in the NAC-LWT cask [USA/9225/B(U)F-85]. All the containers were then transported in one US Air Force C-5B cargo aircraft via air-to-air refueling from Tbilisi, Georgia, to Kinloss Royal Air Force Base outside Inverness, Scotland. In Scotland the fresh and spent fuel was transported north to the Dounreay Nuclear Complex west of Thurso, Caithness, Scotland, for interim storage and final disposition. This successful national security project was the first time the United States teamed with a NATO partner to remove nuclear material from a site of proliferation concern.« less
  • The Pickerill field is a dry-gas accumulation in the southern North Sea. Discovered in 1966, 15 producing wells have been drilled from two platforms. The field produces from the Rotliegendes and Leman sandstone formations in the western margin of the southern North Sea. The reservoir has been described by six vertical zones, with most of the gas in the top three zones. Historically, the focus had been on developing the reserves from the high-productivity zones, which provided high production rates needed for economic development. Little attention was paid to developing the two top zones in the eastern section. However, simulationmore » studies indicated that recovery from the two top zones could be improved by drilling horizontal wells. The paper describes well selection, the decision to drill, implementation of well drilling, the well path design, results, and reservoir performance.« less
  • The world oil picture must be considered when reviewing future engineering pertaining to offshore oil and gas development. Predicting future oil and gas demand is difficult, but highly regarded experts predict the demand will continue to be fairly stable until the end of the century. It is expected, however, that production from existing fields will drop significantly by the end of the year 2000. Therefore, to meet the continuing steady demand, this drop in production will have to be made up from production from new fields. A substantial portion of this oil will come from offshore developments. Various alternatives formore » using floating production systems in developing offshore fields are presented and options of related systems and subsystems are considered.« less
  • This paper describes a unique approach to the acquisition and analysis of dynamic motion response data for a large North Sea platform jacket during docking with a subsea drilling template. The motion-monitoring system, the resultant in-ocean measurement of dynamic response, and the capacity for onsite decision making through comparison of measured data with limiting operational criteria are examined. Comparisons are made between measured jacket responses and those predicted by model tests and analytical techniques, and guidance is provided for similar future designs and operations.