Task 6 -- Advanced turbine systems program conceptual design and product development
The Allison Engine Company has completed the Task 6 Conceptual Design and Analysis of Phase 2 of the Advanced Turbine System (ATS) contract. At the heart of Allison`s system is an advanced simple cycle gas turbine engine. This engine will incorporate components that ensure the program goals are met. Allison plans to commercialize the ATS demonstrator and market a family of engines incorporating this technology. This family of engines, ranging from 4.9 MW to 12 MW, will be suitable for use in all industrial engine applications, including electric power generation, mechanical drive, and marine propulsion. In the field of electric power generation, the engines will be used for base load, standby, cogeneration, and distributed generation applications.
- Research Organization:
- Allison Engine Co., Indianapolis, IN (United States)
- Sponsoring Organization:
- USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
- DOE Contract Number:
- AC21-93MC29257
- OSTI ID:
- 634145
- Report Number(s):
- DOE/MC/29257--5746; ON: DE97005452
- Country of Publication:
- United States
- Language:
- English
Similar Records
Selection of natural Gas Fired Advanced Turbine Systems (GFATS) program - Task 3. Topical report
Advanced turbine systems program conceptual design and product development. Topical report, April 1995
Advanced Turbine Systems program conceptual design and product development. Quarterly report, August--October 1994
Technical Report
·
Wed Jun 01 00:00:00 EDT 1994
·
OSTI ID:95166
Advanced turbine systems program conceptual design and product development. Topical report, April 1995
Technical Report
·
Wed Jan 31 23:00:00 EST 1996
·
OSTI ID:251336
Advanced Turbine Systems program conceptual design and product development. Quarterly report, August--October 1994
Technical Report
·
Sat Dec 31 23:00:00 EST 1994
·
OSTI ID:10119112