Steam Generator Group Project: Task 9 final report, Nondestructive evaluation round robin: Volume 2, Raw inspection data
The Steam Generator Group Project (SGGP) is using the retired-from service Surry 2A pressurized water reactor steam generator as a test bed to investigate the reliability and effectiveness of inservice nondestructive eddy current inspection equipment and procedures. The information developed will provide the technical basis for updating the Regulatory Guides governing inservice inspection and tube plugging criteria of steam generators. This report describes Task 9 of the multi-task project. The objective of Task 9 is to plan, perform and analyze results of four round robin nondestructive examinations on a subset of tubes from the Surry generator. A description of the objectives, conduct and analysis of results for each round robin is presented. Validation of inspection results will be provided by removal of specimens from the generator for destructive and out-of-generator characterization (in progress). Preliminary comparisons of the inspection results in terms of agreement among teams of defect detection and sizing are given for each round robin. The majority of indications were reported at the hot leg top of the tube sheet. The best results on detection agreement ranged between 70 and 90 percent, but reported defect sizes varied significantly between teams for all round robins. The variability in detection and sizing appears to be due to analyst interpretation of the complex eddy current signals rather than differences in inspection equipment.
- Research Organization:
- Nuclear Regulatory Commission, Washington, DC (USA). Div. of Engineering; Pacific Northwest Lab., Richland, WA (USA)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 6325371
- Report Number(s):
- NUREG/CR-4849-Vol.2; PNL-5868-Vol.2; ON: TI89008771; TRN: 89-008310
- Country of Publication:
- United States
- Language:
- English
Similar Records
Steam generator group project: Final report: Post-service baseline eddy current examination, Task 7
Evaluation of sampling plans for in-service inspection of steam generator tubes: Modeling of eddy-current reliability data, analytical evaluations, and initial Monte Carlo simulations
Related Subjects
SURRY-2 REACTOR
STEAM GENERATORS
ACCURACY
COMPARATIVE EVALUATIONS
COMPILED DATA
DEFECTS
EDDY CURRENT TESTING
EVALUATION
HYDRAULICS
IN-SERVICE INSPECTION
NONDESTRUCTIVE ANALYSIS
NONDESTRUCTIVE TESTING
PRESSURE VESSELS
REACTOR SAFETY
REGULATIONS
SIZING
TUBES
US NRC
BOILERS
CHEMICAL ANALYSIS
CONTAINERS
DATA
ELECTROMAGNETIC TESTING
ENRICHED URANIUM REACTORS
FLUID MECHANICS
INFORMATION
INSPECTION
MATERIALS TESTING
MECHANICS
NATIONAL ORGANIZATIONS
NUMERICAL DATA
POWER REACTORS
PWR TYPE REACTORS
REACTORS
SAFETY
TESTING
THERMAL REACTORS
US ORGANIZATIONS
VAPOR GENERATORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210200* - Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled