Development of high temperature turbine subsystem technology to a ''technology readiness status'', phase II. Progress report, March 1979
An order has been placed for the Hot Gas Path Development Test Stand (HGPDTS) exhaust stack and silencer. Fabrication of these assemblies has commenced. The ability to measure tubulence intensity in a fired combustor using a laser doppler velocimeter has been evaluated. A thorough system checkout of the turbine simulator facility has been completed. The two monolithic heat transfer airfoils to be tested in the turbine simulator have been delivered. Local surface Mach number distributors for the first stage nozzle and bucket cascades were obtained from tests in the transonic wind tunnel and results are presented. Retesting of the bucket cascade must be conducted. The Gas Cleanup System overall construction effort is estimated 65% complete and has a May 1979 completion date. Activity relating to the update of the Low Btu Gas Fueled CC Power Plant continues to be directed at the evaluation of a raw gas steam generator in the system. Schematics have been prepared for the extraction air system, the gas fuel system, the hydraulic supply system, the control oil system and the trip oil system for the TRV. An analysis to determine the stresses due to the gas pressure loading in the TRV compressor discharge casing were completed and the results are reported. Heat transfer and stress analyses have been completed for the TRV combustor pilot liner dome. A thermal fatigue analysis for the first stage nozzle trailing edge with a 10 mil wall cooling tube was conducted and is discussed. A detailed vibration analysis is underway for the third stage bucket. The facility for LCF testing of copper alloys in an inert atmosphere is complete. System leak checks are currently being conducted.
- Research Organization:
- General Electric Co., Schenectady, NY (USA). Gas Turbine Div.
- OSTI ID:
- 6322379
- Report Number(s):
- FE-1806-65
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development of high temperature turbine subsystem technology to a technology readiness status, phase II. Progress report, August 1978
Development of high temperature turbine subsystem technology to a ''technology readiness status'': Phase II. Progress report for March 1978
Development of high temperature turbine subsystem technology to a ''technology readiness status'': Phase II. Progress report for July 1978
Technical Report
·
Sun Sep 10 00:00:00 EDT 1978
·
OSTI ID:6531078
Development of high temperature turbine subsystem technology to a ''technology readiness status'': Phase II. Progress report for March 1978
Technical Report
·
Sun Apr 09 23:00:00 EST 1978
·
OSTI ID:5011904
Development of high temperature turbine subsystem technology to a ''technology readiness status'': Phase II. Progress report for July 1978
Technical Report
·
Thu Aug 10 00:00:00 EDT 1978
·
OSTI ID:6562155
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200102* -- Fossil-Fueled Power Plants-- Power Cycles
200104 -- Fossil-Fueled Power Plants-- Components
COMBINED-CYCLE POWER PLANTS
COMBUSTORS
ENERGY SOURCES
ENERGY TRANSFER
EXHAUST GASES
FATIGUE
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GAS TURBINES
GASEOUS WASTES
GASES
HEAT TRANSFER
HIGH TEMPERATURE
LOW BTU GAS
MECHANICAL PROPERTIES
POWER PLANTS
RESEARCH PROGRAMS
STRESS ANALYSIS
TEST FACILITIES
THERMAL POWER PLANTS
TUNNELS
TURBINES
TURBOMACHINERY
WASTES
WIND TUNNELS
200102* -- Fossil-Fueled Power Plants-- Power Cycles
200104 -- Fossil-Fueled Power Plants-- Components
COMBINED-CYCLE POWER PLANTS
COMBUSTORS
ENERGY SOURCES
ENERGY TRANSFER
EXHAUST GASES
FATIGUE
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GAS TURBINES
GASEOUS WASTES
GASES
HEAT TRANSFER
HIGH TEMPERATURE
LOW BTU GAS
MECHANICAL PROPERTIES
POWER PLANTS
RESEARCH PROGRAMS
STRESS ANALYSIS
TEST FACILITIES
THERMAL POWER PLANTS
TUNNELS
TURBINES
TURBOMACHINERY
WASTES
WIND TUNNELS