skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Closure report for CAU Number 430: Buried Depleted Uranium Artillery Round Number 1, Tonopah Test Range

Abstract

Corrective Action Unit (CAU) 430 consists of the Buried Depleted Uranium (DU) Artillery Round No. 1. This Closure Report presents the information obtained from investigate actions performed to justify the decision for clean closure of CAU 430 through ``No Further Action``. The site was thought to consist of a potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Materials to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep. The objectives of the activities were to prepare the site for closure through locating and identifying the projectile, destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination. This report contains the following five sections. Section 1.0 introduces the CAU and scope of work. Section 2.0 of this report presents the closure activities performed as part of this investigation. Waste disposition is discussed in Section 3.0. Closure investigation results are presented in Section 4.0, and references are presented in Sectionmore » 5.0.« less

Publication Date:
Research Org.:
Dept. of Energy, Nevada Operations Office, Environmental Restoration Div., Las Vegas, NV (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
631146
Report Number(s):
DOE/NV-469
ON: DE98003904; TRN: AHC29813%%17
DOE Contract Number:
AC08-92NV10972
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Feb 1997
Country of Publication:
United States
Language:
English
Subject:
45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEFENSE; 54 ENVIRONMENTAL SCIENCES; NEVADA; MILITARY FACILITIES; MILITARY EQUIPMENT; DETECTION; DEMOLITION; DEPLETED URANIUM; REMEDIAL ACTION

Citation Formats

NONE. Closure report for CAU Number 430: Buried Depleted Uranium Artillery Round Number 1, Tonopah Test Range. United States: N. p., 1997. Web. doi:10.2172/631146.
NONE. Closure report for CAU Number 430: Buried Depleted Uranium Artillery Round Number 1, Tonopah Test Range. United States. doi:10.2172/631146.
NONE. 1997. "Closure report for CAU Number 430: Buried Depleted Uranium Artillery Round Number 1, Tonopah Test Range". United States. doi:10.2172/631146. https://www.osti.gov/servlets/purl/631146.
@article{osti_631146,
title = {Closure report for CAU Number 430: Buried Depleted Uranium Artillery Round Number 1, Tonopah Test Range},
author = {NONE},
abstractNote = {Corrective Action Unit (CAU) 430 consists of the Buried Depleted Uranium (DU) Artillery Round No. 1. This Closure Report presents the information obtained from investigate actions performed to justify the decision for clean closure of CAU 430 through ``No Further Action``. The site was thought to consist of a potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Materials to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep. The objectives of the activities were to prepare the site for closure through locating and identifying the projectile, destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination. This report contains the following five sections. Section 1.0 introduces the CAU and scope of work. Section 2.0 of this report presents the closure activities performed as part of this investigation. Waste disposition is discussed in Section 3.0. Closure investigation results are presented in Section 4.0, and references are presented in Section 5.0.},
doi = {10.2172/631146},
journal = {},
number = ,
volume = ,
place = {United States},
year = 1997,
month = 2
}

Technical Report:

Save / Share:
  • 1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less
  • This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This planmore » was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan.« less
  • This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections conducted at the following Corrective Action Units (CAU)s: CAU 400: Bomblet Pit and Five Points Landfill; CAU 404: Roller Coaster Lagoons and Trench; CAU 407: Roller Coaster RadSafe Area; CAU 424: Area 3 Landfill Complexes; CAU 426: Cactus Spring Waste Trenches; CAU 427: Septic Waste Systems 2, 6; and CAU 453: Area 9 UXO Landfill, all located at the Tonopah Test Range, Nevada. Post-closure inspections are not required at CAU 400 but are conducted to monitor vegetation and fencing at the site. Site inspections were conducted in May andmore » November 2002. All site inspections were made after Nevada Division of Environmental Protection (NDEP) approval of the appropriate Closure Report (CR), excluding CAU 400 which did not require a CR, and were conducted in accordance with the Post-Closure Inspection Plans in the NDEP-approved CRs. Post-closure inspections conducted during 2002 identified several areas requiring maintenance/repairs. Maintenance work and proposed additional monitoring are included in the appropriate section for each CAU. This report includes copies of the Post-Closure Inspection Plans, Post-Closure Inspection Checklists, copies of the field notes, photographs, and the Post-Closure Vegetative Monitoring Report. The Post-Closure Inspection Plan for each CAU is located in Attachment A. Post-Closure Inspection Checklists are in Attachment B. Copies of the field notes from each inspection are included in Attachment C. Attachment D consists of the photographic logs and photographs of the sites. The post-closure vegetative monitoring report for calendar year 2002 is included in Attachment E.« less
  • This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.