Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Fast asynchronous level 1 pre-trigger for electrons at L = 10/sup 33/cm/sup -2/sec/sup -1/

Conference ·
OSTI ID:6308950
Asynchronous Triggers have long been used at fixed target accelerators and the CW High Luminosity CERN ISR. Bunched beam colliders have tended to use triggers which were synchronized with the time of the beam crossing. The CDF trigger scheme has 3.5 ..mu..sec between such crossings to decide whether to further process any events which occurred during the crossing. The level 1 trigger can accept a rate of 50 KHz without appreciable dead time. The level 2 trigger uses fast bit-slice processors to select event topologies in 10 ..mu..sec and thus can accept a trigger rate of 5 KHz. Readout of the system which takes 1/2 msec is required for level 3, thus limiting the triggering rate at level 3 to approx. 100 Hz. The purpose of this note is to show that this same trigger scheme would work at a CW luminosity of 10/sup 33/cm/sup -2/sec/sup -1/ by the addition of a conventional hard-wired asynchronous pre-trigger.
Research Organization:
Brookhaven National Lab., Upton, NY (USA)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
6308950
Report Number(s):
BNL-32843; CONF-830224-9; ON: DE83011361
Country of Publication:
United States
Language:
English