History of waste tank 24, 1962--1974

Technical Report ·
DOI:https://doi.org/10.2172/6308666· OSTI ID:6308666
Tank 24 was placed in service in April 1963 receiving HW concentrate from the Building 242-H evaporator. The tank was filled by October 1965. In October 1966 the cooled concentrate supernate was decanted. The tank was again filled with concentrate by March 1967, then decanted in June 1967 and refilled by July 1967. Since that time the tank has remained in service storing LW and HW salt and receiving spent zeolite from the cesium removal column (CRC). In April 1973 an influx of slightly contaminated water in the bottom leak detection sump was observed. The tank was inspected with an optical periscope and numerous tests and investigations were conducted but the source of the contaminated water was not determined. However, subsequent to this report period a D/sub 2/O tracer test in tank 21 which also experienced an influx of contaminated water into its bottom sump provided conclusive evidence of communication between the tank vapor space and the bottom leak detection sump. The D/sub 2/O tracer test was documented in DPSPU 76-11-19. Inspections of the tank interior were performed by direct observation and photography using an optical periscope inserted through access risers in the roof. Samples of the vapor condensate and supernate in the tank, and liquid collected in the bottom leak detection sump were analyzed. Numerous temperature profiles were taken and several equipment modifications and repairs were made.
Research Organization:
Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Plant
DOE Contract Number:
EY-76-C-09-0001
OSTI ID:
6308666
Report Number(s):
DPSPU-79-11-2
Country of Publication: