Short-circuit simulations help quantify wheeling flow

Journal Article · · IEEE Computer Applications in Power
DOI:https://doi.org/10.1109/67.372676· OSTI ID:63029
During the late 1960s, three nuclear power plants were constructed in New England: Connecticut Yankee (590 MW, located in Haddam, Connecticut), Maine Yankee (870 MW located in Wiscasset, Maine), and Vermont Yankee (520 MW, located in Vernon, Vermont). Up to thirty-three New England utilities and municipalities participate in each. These units, called the Yankee units, are connected to the New England 345 kV transmission system. Built before the conception of the New England Power Pool (NEPOOL), these units rely on negotiated transmission agreements to implement the purchased power contracts. The Yankee Transmission Agreements were established to provide a mechanism for New England utilities, which provide the transmission wheeling services, to be adequately compensated for delivering the Yankee power. Under the agreements, the purchasing utilities (those utilities who purchase power from the nuclear plants) would pay into separate transmission funds based on their entitlement in the unit. The fund is then distributed among the transmitting utilities (those utilities providing the transmission wheeling services) based on the calculated use of their transmission systems. A methodology was established that could equal the units` life, offer flexibility to a changing system, and provide equitable results. This article describes how using commercially available software to automate simulations, perform the MW-miles calculation, and tabulate the results significantly reduces the time and computational effort to perform the wheeling calculations.
OSTI ID:
63029
Journal Information:
IEEE Computer Applications in Power, Journal Name: IEEE Computer Applications in Power Journal Issue: 2 Vol. 8; ISSN 0895-0156; ISSN ICAPEH
Country of Publication:
United States
Language:
English

Similar Records

Seismic design decision analysis. Nuclear power plants and the operating basis earthquake - Phase I
Technical Report · Tue Dec 31 23:00:00 EST 1974 · OSTI ID:5664128

New Hampshire gets grand experiment under way
Journal Article · Wed May 29 00:00:00 EDT 1996 · Energy Daily · OSTI ID:459032

Hydro-Quebec's high-voltage interconnections
Journal Article · Mon Jun 01 00:00:00 EDT 1992 · IEEE Power Engineering Review (Institute of Electrical and Electronics Engineers); (United States) · OSTI ID:5043476