Utility advanced turbine systems (ATS) technology readiness testing -- Phase 3. Technical progress report, October 1--December 31, 1997
The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE`s request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown. This report summarizes work accomplished in 4Q97.
- Research Organization:
- General Electric Co., Schenectady, NY (United States)
- Sponsoring Organization:
- USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States); USDOE Assistant Secretary for Energy Efficiency and Renewable Energy, Washington, DC (United States)
- DOE Contract Number:
- FC21-95MC31176
- OSTI ID:
- 629478
- Report Number(s):
- DOE/MC/31176-9; ON: DE98054530; TRN: AHC29812%%141
- Resource Relation:
- Other Information: PBD: [1997]
- Country of Publication:
- United States
- Language:
- English