Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I, preliminary engineering, task 3, site evaluation. Site evaluation report
The Curtiss--Wright PFB Pilot Plant site is located in a full transportation service area with both intramodal and intermodal rail, truck, and air carrier operations sufficient to meet the requirements of the proposed construction project.
- Research Organization:
- Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
- DOE Contract Number:
- EX-76-C-01-1726
- OSTI ID:
- 6290290
- Report Number(s):
- FE-1726-5; CW-WR-76-015-15
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering. Quarterly report, June 1-August 31, 1977
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I: preliminary engineering. Quarterly report, September 1-November 30, 1977
Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I: preliminary engineering. Technology support test results PFB heat exchanger fin and tube materials erosion rig evaluation test period July 1976--April 1977
Technical Report
·
Thu Sep 01 00:00:00 EDT 1977
·
OSTI ID:6290290
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I: preliminary engineering. Quarterly report, September 1-November 30, 1977
Technical Report
·
Thu Dec 01 00:00:00 EST 1977
·
OSTI ID:6290290
Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I: preliminary engineering. Technology support test results PFB heat exchanger fin and tube materials erosion rig evaluation test period July 1976--April 1977
Technical Report
·
Mon May 01 00:00:00 EDT 1978
·
OSTI ID:6290290
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
FLUIDIZED-BED COMBUSTORS
SITE SELECTION
COAL
EVALUATION
FLUIDIZED-BED COMBUSTION
FOSSIL-FUEL POWER PLANTS
PILOT PLANTS
BURNERS
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
COMBUSTION
COMBUSTORS
ENERGY SOURCES
FOSSIL FUELS
FUELS
FUNCTIONAL MODELS
OXIDATION
POWER PLANTS
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
200104* - Fossil-Fueled Power Plants- Components
FLUIDIZED-BED COMBUSTORS
SITE SELECTION
COAL
EVALUATION
FLUIDIZED-BED COMBUSTION
FOSSIL-FUEL POWER PLANTS
PILOT PLANTS
BURNERS
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
COMBUSTION
COMBUSTORS
ENERGY SOURCES
FOSSIL FUELS
FUELS
FUNCTIONAL MODELS
OXIDATION
POWER PLANTS
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
200104* - Fossil-Fueled Power Plants- Components