Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Annual technology assessment and progress report for the buried transuranic waste program at the Idaho National Engineering Laboratory

Technical Report ·
OSTI ID:6287275
The US Department of Energy (DOE) is responsible for developing and implementing methods for the safe and environmentally acceptable disposal of radioactive waste. In 1983, DOE formulated a comprehensive plan to manage transuranic (TRU) defense waste. The DOE plan for buried TRU waste is to monitor it, take remedial actions as necessary, and reevaluate its safety periodically. The DOE strategy reflects concern that, based on present technology, retrieval and processing of buried waste may be risky and costly. To implement the DOE plan, EG and G Idaho, Inc., prime contractor at the Idaho National Engineering Laboratory (INEL), has developed a strategy for long-term management of the 2 million cubic feet of INEL buried TRU waste. That strategy involves four main activities: (a) environmental monitoring, (b) remedial action if necessary, (c) assimilation of data from both special studies and ongoing waste management activities, and (d) selection of a long-term management alternative in 1995. This report, submitted as the first in a series of annual reports, summarizes the buried TRU waste activities performed in fiscal year (FY) 1984 at the INEL in response to the DOE plan. Specifically, technologies applicable to buried waste confinement, retrieval, certification, and processing have been assessed, a long-range plan to conduct buried wasted studies over the next ten years has been prepared, and retrieval and soil management alternatives have been evaluated. 17 references, 7 figures, 1 table.
Research Organization:
EG and G Idaho, Inc., Idaho Falls (USA)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
6287275
Report Number(s):
EGG-2321; ON: DE85003155
Country of Publication:
United States
Language:
English