New Bedford Harbor Superfund Project Acushnet River estuary engineering feasibility study of dredging and dredged-material disposal alternatives. Report 10. Evaluation of dredging and dredging control technologies. Technical report, August 1985-March 1988
Technical Report
·
OSTI ID:6280385
This report presents the results of an evaluation of dredging equipment and techniques for removal of highly contaminated sediments from the upper estuary of the Acushnet River, a portion of the New Bedford Harbor Superfund Project. Site conditions as related to dredge selection and operation, factors considered in selection of equipment, various dredge types considered for use, and operational procedures and controls for sediment resuspension during dredging are described. Each of the dredge types is ranked according to the following criteria: compatibility for full-scale cleanup, availability, safety, potential for sediment resuspension, maneuverability, cleanup precision, cost and production flexibility, required water depth for operation, ability to access the site, and compatibility with disposal options.
- Research Organization:
- Army Engineer Waterways Experiment Station, Vicksburg, MS (USA). Environmental Lab.
- OSTI ID:
- 6280385
- Report Number(s):
- AD-A-203526/9/XAB; WES/TR/EL-88-15-10
- Country of Publication:
- United States
- Language:
- English
Similar Records
New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged-material disposal alternatives. Report 3. Characterization and elutriate testing of Acushnet River Estuary sediment. Technical report, August 1985-March 1988
New Bedford Harbor Superfund Project, Acushnet River estuary engineering feasibility study of dredging and dredged-material disposal alternatives. Report 11. Evaluation of conceptual dredging and disposal alternatives. Technical report, August 1985-July 1988
New Bedford Harbor Superfund Project, Acushnet River estuary engineering feasibility study of dredging and dredged-material disposal alternatives. Report 1. Study overview. Technical report, August 1985-March 1988
Technical Report
·
Tue Feb 28 23:00:00 EST 1989
·
OSTI ID:5724354
New Bedford Harbor Superfund Project, Acushnet River estuary engineering feasibility study of dredging and dredged-material disposal alternatives. Report 11. Evaluation of conceptual dredging and disposal alternatives. Technical report, August 1985-July 1988
Technical Report
·
Sat Jul 01 00:00:00 EDT 1989
·
OSTI ID:5163372
New Bedford Harbor Superfund Project, Acushnet River estuary engineering feasibility study of dredging and dredged-material disposal alternatives. Report 1. Study overview. Technical report, August 1985-March 1988
Technical Report
·
Sat Oct 01 00:00:00 EDT 1988
·
OSTI ID:6786823
Related Subjects
29 ENERGY PLANNING, POLICY, AND ECONOMY
290300 -- Energy Planning & Policy-- Environment
Health
& Safety
520600* -- Environment
Aquatic-- Regulations -- (-1989)
54 ENVIRONMENTAL SCIENCES
CLEANING
CONTROL
DEPTH
DIMENSIONS
DOCUMENT TYPES
DREDGE SPOIL
DREDGING
ESTUARIES
FEDERAL REGION I
HARBORS
LAWS
MANAGEMENT
MASSACHUSETTS
NORTH AMERICA
POLLUTION ABATEMENT
POLLUTION LAWS
PRODUCTION
PROGRESS REPORT
RIVERS
SEDIMENTS
STREAMS
SUPERFUND
SURFACE WATERS
USA
WASTE DISPOSAL
WASTE MANAGEMENT
WATER POLLUTION ABATEMENT
290300 -- Energy Planning & Policy-- Environment
Health
& Safety
520600* -- Environment
Aquatic-- Regulations -- (-1989)
54 ENVIRONMENTAL SCIENCES
CLEANING
CONTROL
DEPTH
DIMENSIONS
DOCUMENT TYPES
DREDGE SPOIL
DREDGING
ESTUARIES
FEDERAL REGION I
HARBORS
LAWS
MANAGEMENT
MASSACHUSETTS
NORTH AMERICA
POLLUTION ABATEMENT
POLLUTION LAWS
PRODUCTION
PROGRESS REPORT
RIVERS
SEDIMENTS
STREAMS
SUPERFUND
SURFACE WATERS
USA
WASTE DISPOSAL
WASTE MANAGEMENT
WATER POLLUTION ABATEMENT