Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Welding for the CRBRP steam generators

Conference ·
OSTI ID:6272864
The rationale for selecting weld design, welding procedures and inspection methods was based upon the desire to obtain the highest reliability welds for the CRBRP steam generators. To assure the highest weld reliability, heavy emphasis was placed on the control of material cleanliness and composition substantially exceeding the requirements of the ASME Code for 2-1/4Cr--1Mo. The high tube/tubesheet weld quality was achieved through close material control, an extensive weld development program and the selection of high reliability welding equipment. Shell and nozzle weld fabrication using TIG, MIG, and submerged arc procedures are also being controlled through precise specifications, including preheat and postheat programs, together with radiography and ultrasonic inspection to ascertain the weld quality desired. Details of the tube/tubesheet welding and shell welding are described and results from the weld testing program are discussed.
Research Organization:
General Electric Co., Sunnyvale, CA (USA); Atomics International Div., Canoga Park, CA (USA); Clinch River Breeder Reactor Plant Project Office, Oak Ridge, TN (USA)
DOE Contract Number:
EW-76-C-15-2395; EW-76-C-15-0003
OSTI ID:
6272864
Report Number(s):
GEFR-SP-151; CONF-790426-2
Country of Publication:
United States
Language:
English