Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Guidelines for nuclear-power-plant safety-issue prioritization information development

Technical Report ·
DOI:https://doi.org/10.2172/6271348· OSTI ID:6271348
This is the second in a series of reports to document the use of a methodology developed by the Pacific Northwest Laboratory to calculate, for prioritization purposes, the risk, dose and cost impacts of implementing resolutions to reactor safety issues. This report contains results of issue-specific analyses for 15 issues. Each issue was considered within the contraints of available information as of September 1982 and two staff-weeks of labor. The results will be referenced, as one consideration in setting priorities for reactor safety issues, in an NRC prioritization report to be published at a future date.
Research Organization:
Pacific Northwest Lab., Richland, WA (USA)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
6271348
Report Number(s):
NUREG/CR-2800-Suppl.1.; PNL-4297-Suppl.1; ON: DE83012288
Country of Publication:
United States
Language:
English