Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Commercial scale demonstration enhanced oil recovery by micellar-polymer flood. Technical progress report, November 1984

Technical Report ·
OSTI ID:6261653
This report describes work conducted on the Maraflood oil recovery process, M-1 Project, throughout the month of November, 1984. Information is presented under two Work Breakdown Structure (WBS) elements: WBS 2100 - Fluid Injection and WBS 2300 - Performance Monitoring. Fluid Injection reporting includes a discussion of hydrogen peroxide stimulation of twelve 5.0-acre injection wells. Performance Monitoring reporting includes discussions of the 2.5-acre and 5.0-acre pattern oil cut performance for November, 1984, the October, 1984, high sulfonate content wells, and the October, 1984, tritiated water analysis. 16 figures.
Research Organization:
Marathon Oil Co., Findlay, OH (USA)
DOE Contract Number:
AC03-78ET13077
OSTI ID:
6261653
Report Number(s):
DOE/ET/13077-101; ON: DE85006483
Country of Publication:
United States
Language:
English