skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Visual weld acceptance criteria: Volume 3, Training manual for inspectors of structural welds at nuclear power plants using the acceptance criteria of NCIG-01 (NCIG-03, Revision 1): Final report

Technical Report ·
OSTI ID:6259521

The Nuclear Construction Issues Group (NCIG) was formed to resolve common problems being experienced at nuclear power plants in the assurance of hardware quality for which common solutions likely existed. The initial activity undertaken by this group was development of visual weld acceptance criteria and inspection guidance for structural welds. This report documents the results of this NCIC - activity the discussion of a training manual for inspectors of structural welds at nuclear power plants using the acceptance criteria of NCIG-01 (NCIG-03, Revision 1).

Research Organization:
Reedy Associates, Inc., Los Gatos, CA (USA); Nuclear Construction Issues Group, St. Louis, MO (USA); Electric Power Research Inst., Palo Alto, CA (USA)
OSTI ID:
6259521
Report Number(s):
EPRI-NP-5380-Vol.3; ON: TI88920033
Country of Publication:
United States
Language:
English