Title: Assessment of U/sub 3/O/sub 8/ requirements and fuel cycle costs resulting from thorium fuel cycle in HWRs (CANDUs)

Technical Report ·
OSTI ID:6222429

Based on available, published information, it is apparent that the CANDU heavy water reactor requires a significantly lower lifetime U/sub 3/O/sub 8/ supply than a comparably operated light water reactor. Thorium utilization in the CANDU system has the potential of requiring only 30 to 35% as much fuel, at realistic conversion ratios (0.85 to 0.9), as a no recycle CANDU. This advantage is partially offset by the much higher initial U/sub 3/O/sub 8/ and fissile requirements of the thorium fueled options. The effect of an expanding nuclear power system tends to amplify these higher front end U/sub 3/O/sub 8/ requirements. For example, at a growth rate of five reactors per year, 11 years are required before the fuel requirements for a thorium fueled CANDU (conversion ratio = 0.85) become less than those of a CANDU-no recycle and between 27 and 30 years before they are less than those of a CANDU system on plutonium recycle. The economics of thorium utilization seem to be marginal (as a consequence of high recovery costs) for plutonium makeup recovered from CANDU fuels, but may be competitive operating on U-235 makeup. A definite economic optimum seems to exist for conversion ratios between 0.8 and 0.9, based on present cost concepts.

Research Organization:
Oak Ridge Gaseous Diffusion Plant, TN (USA)
DOE Contract Number:
AC05-84OT21400
OSTI ID:
6222429
Report Number(s):
K/OP-219; ON: DE86003587
Country of Publication:
United States
Language:
English