Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Magnetohydrodynamic projects at the CDIF

Technical Report ·
DOI:https://doi.org/10.2172/6202515· OSTI ID:6202515
This quarterly technical progress report presents the tasks accomplished at the Component Development and Integration Facility during the second quarter of FY91. Areas of technical progress this quarter included: coal system development; seed system development; test train/A-Bay modifications; channel power dissipation and distribution system development; oxygen system storage upgrade; iron-core magnet thermal protection system checkout; TRW slag rejector/CDIF slag removal project; Data Acquisition System; stack gas/environmental compliance upgrade; coal-fired combustor support; 1A channels fabrication and assembly; support of Mississippi State University diagnostic testing; test operations and results; data analysis and modeling; technical papers; and projected activities. 2 figs., 2 tabs.
Research Organization:
MSE, Inc., Butte, MT (United States)
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC07-88ID12735
OSTI ID:
6202515
Report Number(s):
DOE/ID/12735-T19; ON: DE92002636
Country of Publication:
United States
Language:
English