Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Six meter coke battery renovation at Great Lakes Division, National Steel Corporation

Conference · · Proceedings, Ironmaking Conference; (United States)
OSTI ID:6185995
;  [1]
  1. National Steel Corp., Pittsburgh, PA (United States)
In 1990, National Steel Corporation initiated the renovation of its No. 5 Battery Facility to reduce Great Lakes Division dependency on outside coke sources by producing enough coke to meet 60% of Great Lakes Division needs. The renovation of the No. 5 Coke Battery and associated By-Product Plant required work in the Battery, Oven Machinery, Coal Handling, Coke Handling and By-Product Plants No. 3 and No. 2. The paper briefly describes the scope of the renovations, then describes the equipment, modifications made, and results of modifications for the following: coal handling system, oven battery (heating, structural design, and process control), oven machinery (U-tube car, pusher machine, on spot door machine, hood car, and quench car), coke handling, and by-products plant (tar and liquor system, primary cooling, exhausters and tar precipitators, secondary gas cooling/ammonia scrubbing, light oil system, waste water treatment and benzene emission controls, and computerized control system).
OSTI ID:
6185995
Report Number(s):
CONF-9303222--
Conference Information:
Journal Name: Proceedings, Ironmaking Conference; (United States) Journal Volume: 52
Country of Publication:
United States
Language:
English