Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Solvent refined coal (SRC) process operation of solvent-refined coal pilot plant, Wilsonville, Alabama. Quarterly technical progress report, July-September 1980

Technical Report ·
OSTI ID:6185022
This report summarizes the operating data and test results obtained at the 6 ton per day solvent refined coal (SRC) pilot plant in Wilsonville, Alabama for the third quarter of 1980. Kentucky 9 coal from the Fies mine was processed during the early part of the period (Runs 211 and 212) and again later in the period (Runs 215 through 217). Kentucky 9 coal from the Dotiki mine was fed to the pilot plant during Runs 213 and 214. Coal conversion ranged from 93.0% to 94.3% of the MAF coal, while the SRC yield ranged from 43% to 81% of the MAF coal. Recovery of SRC from the Critical Solvent Deashing (CSD) unit ranged from 72.7% to 91.3%. The objectives of the runs scheduled were: to evaluate the performance of deashing solvent B in the CSD unit in comparison with deashing solvent A; to investigate the processing of high-chlorine coal and to test the Industrial Filter and Pump Manufacturing Co. candle filter; to simulate the design conditions for a 6000 tpd SRC demonstration plant; and to evaluate the effects of increasing light SRC addition to the SRC unit with respect to overall unit performance, SRC yield, SRC sulfur content, and solvent balance.
Research Organization:
Catalytic, Inc., Wilsonville, AL (USA)
DOE Contract Number:
AC01-76ET10154
OSTI ID:
6185022
Report Number(s):
DOE/ET/10154-T12; FE-2270-78; ON: DE81027215
Country of Publication:
United States
Language:
English