Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

The trial burn experience - planning, preparation, and pitfalls

Conference ·
OSTI ID:617710
 [1]
  1. Safety-Kleen Corp., Elgin, IL (United States)
For RCRA Part B permitting, Boilers and Industrial Furnaces permits are required to submit a plan, obtain agency approval, and conduct a trial burn. Cement kilns undergoing this process have particular difficulties with the vagaries of trial burn requirements. To demonstrate compliance with BIF standards, a cement kiln is challenged to develop a safe, yet productive operating envelope which will prevail for the term of the Part B permit. In developing this operating envelope, the kiln must be operated in a number of scenarios to show compliance with the performance standards. The requirement of a number of scenarios is necessitated by conflicting operating parameters. In addition to traditional trial burn goals, cement kilns have also been requested to provide supplementary trial burn emissions data for an indirect risk assessment. Based upon the author`s recent experiences with trial burns and BIF compliance testing, the important aspects of planning, preparation for, and conducting a trial burn at a cement kiln will be presented. This paper will provide insight into how to design a trial burn considering conflicting parameters, effectively prepare the kiln process and people involved with a trial burn, and, conducting a successful trial burn. 3 refs., 1 fig., 2 tabs.
OSTI ID:
617710
Report Number(s):
CONF-9704196--
Country of Publication:
United States
Language:
English