Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Development, testing and evaluation of MHD materials and component designs. Quarterly report, January--March 31, 1978

Technical Report ·
DOI:https://doi.org/10.2172/6175307· OSTI ID:6175307
Efforts during the January through March 1978 quarter were directed towards the evaluation of MHD electrodes for both clean and coal fired environments. Electrochemical screening tests in simulated liquid slags have continued, and provide additional information on the chemistry, mechanisms, and kinetics of electrode/slag reactions. U-02 Proof Test 3 was completed in early January. A post-test evaluation was made and the results compared with those of the previous 2 proof tests. Post-test materials characterization, including efforts at National Bureau of Standards (NBS) and Battelle Pacific Northwest Laboratories (BNW), was completed and provided the basis for the selection of LaCrO/sub 3/- based electrode materials with compliant Ni-mesh attachments for the U-02 Phase III electrode walls. Materials development and detail design activities in support of the U-02 Phase III module continued, and U-02 Phase III electrode sub-assemblies were prepared.
Research Organization:
Westinghouse Electric Corp., Pittsburgh, PA (USA). Advanced Energy Systems Div.
DOE Contract Number:
EX-76-C-01-2248
OSTI ID:
6175307
Report Number(s):
FE-2248-19
Country of Publication:
United States
Language:
English