Decontamination and decommissioning of the MTR-603 HB-2 cubicle. Final report
Technical Report
·
OSTI ID:6164941
This report describes the decontamination and decommissioning (D and D) of the MTR-603 HB-2 cubicle located at the Idaho National Engineering Laboratory (INEL). The HB-2 cubicle became radioactively contaminated during out-of-pile circulating water loop experiments conducted in the Materials Testing Reactor in the 1950s and 1960s. This report describes work performed to accomplish the D and D objectives of reducing the high radiation fields caused by contamination inside the cubicle, preventing future contamination spread, and making about 1400 ftS of floor space available for reuse. D and D of the HB-2 cubicle consisted of total dismantlement of the cubicle and its contents.
- Research Organization:
- EG and G Idaho, Inc., Idaho Falls (USA)
- DOE Contract Number:
- AC07-76ID01570
- OSTI ID:
- 6164941
- Report Number(s):
- EGG-2431; ON: DE86005758
- Country of Publication:
- United States
- Language:
- English
Similar Records
Decontamination and decommissioning of the MTR (Materials Testing Reactor)-603 HB-2 cubicle
Decontamination and decommissioning of CPP-603 BIF filter room. Final report
CPP-603 Chloride Removal System Decontamination and Decommissioning. Final report
Conference
·
Thu Oct 01 00:00:00 EDT 1987
·
OSTI ID:5989011
Decontamination and decommissioning of CPP-603 BIF filter room. Final report
Technical Report
·
Fri Nov 30 23:00:00 EST 1984
·
OSTI ID:6250261
CPP-603 Chloride Removal System Decontamination and Decommissioning. Final report
Technical Report
·
Sun Jan 31 23:00:00 EST 1993
·
OSTI ID:10161121