PWR station blackout accident results for the Bellefonte and Seabrook plants
Conference
·
OSTI ID:6162612
The analyses have shown that the Bellefonte and Seabrook plants responded similarly to the TMLB station blackout sequence. Although the significant events that occurred were the same, the timing was different. The transient occurred much faster in Bellefonte than in Seabrook because of the smaller initial liquid inventory on the
- Research Organization:
- EG and G Idaho, Inc., Idaho Falls (USA)
- DOE Contract Number:
- AC07-76ID01570
- OSTI ID:
- 6162612
- Report Number(s):
- EGG-M-18384; CONF-8410142-63; ON: DE85003589
- Country of Publication:
- United States
- Language:
- English
Similar Records
Thermal-hydraulic and core damage analysis of the station blackout transient in pressurized water reactors
SCDAP severe core-damage studies: BWR ATWS and PWR station blackout
Feedwater transient and small break loss of coolant accident analyses for the Bellefonte Nuclear Plant
Conference
·
Sat Dec 31 23:00:00 EST 1983
·
OSTI ID:6315107
SCDAP severe core-damage studies: BWR ATWS and PWR station blackout
Conference
·
Fri Dec 31 23:00:00 EST 1982
·
OSTI ID:5624615
Feedwater transient and small break loss of coolant accident analyses for the Bellefonte Nuclear Plant
Technical Report
·
Sat Feb 28 23:00:00 EST 1987
·
OSTI ID:6593873