Total quality in spent fuel pool reracking
Conference
·
OSTI ID:61325
- Brand Utility Services, Inc., Essex, CT (United States). Spent Fuel Services
- General Dynamics, Groton, CT (United States). Electric Boat Division
- American Crane and Equipment Co., Douglassville, PA (United States)
- Stone and Webster Engineering Corp., Boston, MA (United States). Nuclear Technology and Licensing
- Yankee Atomic Electric Co., Bolton, MA (United States). Reactor Physics Group
The nuclear utility environment is one of strict cost control under prescriptive regulations and increasing public scrutiny. This paper presents the results of A Total Quality approach, by a dedicated team, that addresses the need for increased on-site spent fuel storage in this environment. Innovations to spent fuel pool reracking, driven by utilities` specific technical needs and shrinking budgets, have resulted in both product improvements and lower prices. A Total Quality approach to the entire turnkey project is taken, thereby creating synergism and process efficiency in each of the major phases of the project: design and analysis, licensing, fabrication, installation and disposal. Specific technical advances and the proven quality of the team members minimizes risk to the utility and its shareholders and provides a complete, cost effective service. Proper evaluation of spent fuel storage methods and vendors requires a full understanding of currently available customer driven initiatives that reduce cost while improving quality. In all phases of a spent fuel reracking project, from new rack design and analysis through old rack disposal, the integration of diverse experts, at all levels and throughout all phases of a reracking project, better serves utility needs. This Total Quality environment in conjunction with many technical improvements results in a higher quality product at a lower cost.
- OSTI ID:
- 61325
- Report Number(s):
- CONF-930749--
- Country of Publication:
- United States
- Language:
- English
Similar Records
US reactor spent-fuel storage capabilities
U. S. reactor spent-fuel storage capabilities. Technical report
Reracking to increase spent fuel storage capacity
Technical Report
·
Tue Jun 01 00:00:00 EDT 1982
·
OSTI ID:5366796
U. S. reactor spent-fuel storage capabilities. Technical report
Technical Report
·
Tue Jun 01 00:00:00 EDT 1982
·
OSTI ID:6391952
Reracking to increase spent fuel storage capacity
Technical Report
·
Thu May 01 00:00:00 EDT 1980
·
OSTI ID:5307039