Application of 5700. 6B, Quality Assurance, to ES and H programs: Mound's approach and results
Quality Assurance has always been integral to Mound's production and support operations. Weapons material and other designated material for WR programs are processed and controlled per the requirements of DOE/AL Quality Control Policy QC-1. Mound's non-WR activities, such as siting, design, construction, testing, operation, maintenance, development, and production of materials, components, and systems, and acquisition of research and technology data, are to be processed and controlled per the requirements of AL Order 5700.6. This paper presents an overview of the entire Quality Assurance Program at Mound and specifically addresses Mound's formal application of Quality Assurance to our comprehensive Environmental, Safety and Health (ES and H) Programs. 4 figures, 1 table.
- Research Organization:
- Monsanto Research Corp., Miamisburg, OH (USA). Mound
- DOE Contract Number:
- AC04-76DP00053
- OSTI ID:
- 6128279
- Report Number(s):
- MLM-3217(OP); CONF-841187-14; ON: DE85003304
- Resource Relation:
- Conference: 5. DOE environmental protection information meeting, Albuquerque, NM, USA, 6 Nov 1984; Other Information: Paper copy only, copy does not permit microfiche production
- Country of Publication:
- United States
- Language:
- English
Similar Records
Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation
Guidance for implementing an environmental, safety and health assurance program. Volume 14. Model guidelines for utilizing quality assurance support in environmental, safety and health assurance programs. [Guidance for quality assurance programs]