Construction quality assurance program plan for the WIPP project, Carlsbad, NM: Revision 1
The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization.
- Research Organization:
- Westinghouse Electric Corp., Carlsbad, NM (USA). Waste Isolation Div.
- DOE Contract Number:
- AC04-86AL31950
- OSTI ID:
- 6126398
- Report Number(s):
- DOE/WIPP-207-Rev.1; ON: DE89015454
- Country of Publication:
- United States
- Language:
- English
Similar Records
Quality assurance (QA) plan for the transportation and receipt of transuranic (TRU) waste
Operations program plan: Revision 3
Related Subjects
053000 -- Nuclear Fuels-- Environmental Aspects
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
COMPLIANCE
FUNCTIONAL MODELS
HIGH-LEVEL RADIOACTIVE WASTES
MANAGEMENT
MATERIALS
NATIONAL ORGANIZATIONS
NUCLEAR FACILITIES
PILOT PLANTS
PLANNING
QUALITY ASSURANCE
RADIOACTIVE MATERIALS
RADIOACTIVE WASTE FACILITIES
RADIOACTIVE WASTES
STANDARDS
UNDERGROUND DISPOSAL
UNDERGROUND FACILITIES
US DOE
US ORGANIZATIONS
WASTE DISPOSAL
WASTE MANAGEMENT
WASTES
WIPP