Preparation of SARs for nonreactor nuclear facilities at the Savannah River Plant
Conference
·
OSTI ID:6122591
Safety Analysis Reports for designated nonreactor nuclear facilities at the Savannah River Plant are prepared in accordance with the DOE Savannah River Manual Chapter 52X1. The accident analysis section is based on the Integrated Risk Assessment Plan, a methodology developed by the Savannah River Laboratory for reprocessing facilities. In general, designated facilities contain radioactive, chemical, or other materials to the extent that a credible accident could have a significant detrimental effect on health and safety. The responsibility for specifying which facilities are designated rests with the manager, Savannah River Operations Office.
- Research Organization:
- Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.
- DOE Contract Number:
- AC09-76SR00001
- OSTI ID:
- 6122591
- Report Number(s):
- DP-MS-81-89; CONF-811085-3; ON: DE82002258
- Country of Publication:
- United States
- Language:
- English
Similar Records
Human error model adaptation and validation for Savannah River Site nonreactor facilities
Application of probabilistic risk assessment to nuclear fuel reprocessing at the Savannah River Plant
Transuranic-contaminated solid waste Treatment Development Facility. Final safety analysis report
Conference
·
Wed Sep 01 00:00:00 EDT 1993
·
OSTI ID:10102668
Application of probabilistic risk assessment to nuclear fuel reprocessing at the Savannah River Plant
Conference
·
Mon Dec 31 23:00:00 EST 1979
·
OSTI ID:5116359
Transuranic-contaminated solid waste Treatment Development Facility. Final safety analysis report
Technical Report
·
Sun Jul 01 00:00:00 EDT 1979
·
OSTI ID:6275961