Heavy water makes heavy weather
Journal Article
·
· Cost Eng. (Morgantown, W.Va.); (United States)
OSTI ID:6027608
Not often is a process plant built that does not work at all, but it can happen and it has happened. A case history of the Glace Bay Heavy Water Plant in Canada is presented. Canada chose to use natural uranium for the production of electricity using nuclear power, with heavy water as the moderator. The Glace Bay Heavy Water Plant was put in operation in 1960. Only now, some 20 years later, is production approaching more than half that originally planned. The original budget was some US $33 million, with completion scheduled for 1967. Production was finally achieved, at but 20% of the original design capacity, some ten years later, in 1976. The lessons learned during the time of construction and initial operation are discussed.
- OSTI ID:
- 6027608
- Journal Information:
- Cost Eng. (Morgantown, W.Va.); (United States), Journal Name: Cost Eng. (Morgantown, W.Va.); (United States) Vol. 23:6; ISSN CSTED
- Country of Publication:
- United States
- Language:
- English
Similar Records
Canada slows heavy water supply plans after plant rebuild
REVIEW OF HEAVY WATER PRODUCTION PROCESSES.
Bruce paves the way for Canada's nuclear future
Journal Article
·
Tue Jun 01 00:00:00 EDT 1976
· Energy Int.; (United States)
·
OSTI ID:7132069
REVIEW OF HEAVY WATER PRODUCTION PROCESSES.
Technical Report
·
Tue Jul 01 00:00:00 EDT 1969
·
OSTI ID:4077785
Bruce paves the way for Canada's nuclear future
Journal Article
·
Wed Oct 31 23:00:00 EST 1973
· Energy Int., v. 10, no. 11, pp. 28-30
·
OSTI ID:4403142