This study, conducted by Black & Veatch, was funded by the U.S. Trade and Development Agency. The report, produced for the Ministry of National Resources, Energy and Environment (MNRE) of Swaziland, determines the least cost capacity expansion option to meet the future power demand and system reliability criteria of Swaziland, with particular emphasis on the proposed interconnector between Swaziland and Mozambique. Volume 2, the Final Report, contains the following sections: (1.0) Introduction; (2.0) Review of SEB Power System; (3.0) SEB Load Forecast and Review; (4.0) SEB Load Forecast Revision; (5.0) The SEB Need for Power; (6.0) SEB System Development Plan Review; (7.0) Southern Mozambique EdM power System Review; (8.0) Southern Mozambique EdM Energy and Demand; (9.0) Supply Side Capacity Options for Swaziland and Mozambique; (10.0) SEB Expansion Plan Development; (11.0) EdM Expansion Plan Development; (12.0) Cost Sharing of the Interconnector; (13.0) Enviroinmental Evaluation of Interconnector Options; (14.0) Generation/Transmission Trade Offs; (15.0) Draft Interconnection Agreement and Contract Packages; (16.0) Transmission System Study; (17.0) Automatic General Control; (18.0) Automatic Startup and Shutdown of Hydro Electric Power Plants; (19.0) Communications and Metering; (20.0) Conclusions and Recommendations; Appendix A: Demand Side Management Primer; Appendix B. PURPA and Avoided Cost Calculations.
- Research Organization:
- Black and Veatch, Overland Park, KS (United States)
- OSTI ID:
- 600819
- Report Number(s):
- PB--98-128044/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Feasibility study for the swaziland/mozambique interconector. Executive summary of the final report. Export trade information
Feasibility study for the Swaziland/Mozambique interconnector. EPC specifications. Export trade information
Hwange thermal power plant expansion: Appendices, Volume 2. Export trade information
Technical Report
·
Fri Oct 31 23:00:00 EST 1997
·
OSTI ID:600817
Feasibility study for the Swaziland/Mozambique interconnector. EPC specifications. Export trade information
Technical Report
·
Fri Oct 31 23:00:00 EST 1997
·
OSTI ID:600821
Hwange thermal power plant expansion: Appendices, Volume 2. Export trade information
Technical Report
·
Mon Jan 29 23:00:00 EST 1996
·
OSTI ID:218118