Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Dual concentric gas-lift completion design for the Thistle field

Journal Article · · SPE (Society of Petroleum Engineers) Production Engineering; (United States)
DOI:https://doi.org/10.2118/18391-PA· OSTI ID:6005815

A unique dual concentric gas-lift completion was installed in two wells in the thistle field during 1987. This paper outlines the completion concept and design, including vertical-lift performance and tubing movement/stress analysis. Results of field performance after 1 year of production history are presented and compared with predicted values.

OSTI ID:
6005815
Journal Information:
SPE (Society of Petroleum Engineers) Production Engineering; (United States), Journal Name: SPE (Society of Petroleum Engineers) Production Engineering; (United States) Vol. 6:1; ISSN SPENE; ISSN 0885-9221
Country of Publication:
United States
Language:
English