Procedures and criteria for increasing the earthquake resistance level of electrical substations and special installations
This report defines a procedure and provides basic information needed to determine the modifications required to make electrical substations and special installations of the Bonneville Power Administration (BPA) more resistant to strong earthquake ground motion. It also provides a procedure for developing an effective plan for establishing the sequence, or priority, of providing the required modifications.
- Research Organization:
- Agbabian Associates, El Segundo, CA (USA)
- OSTI ID:
- 5997853
- Report Number(s):
- DOE/NBM-6006717; ON: DE86006717
- Country of Publication:
- United States
- Language:
- English
Similar Records
High voltage electric substation performance in earthquakes
Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.
Canby Area Service Project substation and associated transmission line. Environmental Assessment
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:403450
Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.
Technical Report
·
Fri Jan 31 23:00:00 EST 1992
·
OSTI ID:5333156
Canby Area Service Project substation and associated transmission line. Environmental Assessment
Technical Report
·
Fri Jan 31 23:00:00 EST 1992
·
OSTI ID:10141404
Related Subjects
200300* -- Electric Power Engineering-- Power Transmission & Distribution-- (-1989)
24 POWER TRANSMISSION AND DISTRIBUTION
BONNEVILLE POWER ADMINISTRATION
DESIGN
EARTHQUAKES
ENGINEERING
GROUND MOTION
MOTION
NATIONAL ORGANIZATIONS
POWER SUBSTATIONS
SAFETY ENGINEERING
SEISMIC EFFECTS
SEISMIC EVENTS
US DOE
US ORGANIZATIONS
24 POWER TRANSMISSION AND DISTRIBUTION
BONNEVILLE POWER ADMINISTRATION
DESIGN
EARTHQUAKES
ENGINEERING
GROUND MOTION
MOTION
NATIONAL ORGANIZATIONS
POWER SUBSTATIONS
SAFETY ENGINEERING
SEISMIC EFFECTS
SEISMIC EVENTS
US DOE
US ORGANIZATIONS