Retrofit FGD (Flue Gas Desulfurization) cost estimating guidelines: Computer user's manual
Technical Report
·
OSTI ID:5986052
This program enables the utility engineer to determine site-specific retrofit costs for six Flue Gas Desulfurization (FGD) processes: Conventional Wet Limestone, Limestone with Forced Oxidation, Lime Double Alkali, Lime Spray Drying, Wellman-Lord, and CT-121. The calculation methodology is based on EPRI Report CS-3696, ''Retrofit FGD Cost Estimating Guidelines'' published in October 1984, which applies a series of factors to the cost of a new FGD system. The factors correct for site-specific conditions, such as process variables, location, and retrofit difficulty. The following calculations are performed in the program: Total Retrofit Capital Requirement; First-Year Operating and Maintenance (O and M) cost; and Total Levelized Cost. The program uses the Detailed Retrofit Cost Estimate as described in EPRI-CS-3696 with one major exception. The program is equipped to handle up to 5 units of different size, with different fuel characteristics, retrofit difficulty, process variables, etc. Common shared equipment, such as reagent preparation and waste disposal, can also be included.
- Research Organization:
- Stearns Catalytic Corp., Denver, CO (USA); Electric Power Research Inst., Palo Alto, CA (USA)
- OSTI ID:
- 5986052
- Report Number(s):
- EPRI-CS-5408-CCM; ON: TI88920006
- Country of Publication:
- United States
- Language:
- English
Similar Records
Selection logic and estimating procedures for retrofit FGD systems
Economic and design factors for flue gas desulfurization technology. Final report
Review of flue gas desulfurization/utility flue gas desulfurization in the US
Conference
·
Sat Sep 01 00:00:00 EDT 1984
· Am. Soc. Mech. Eng., (Pap.); (United States)
·
OSTI ID:6472213
Economic and design factors for flue gas desulfurization technology. Final report
Technical Report
·
Mon Mar 31 23:00:00 EST 1980
·
OSTI ID:5358860
Review of flue gas desulfurization/utility flue gas desulfurization in the US
Journal Article
·
Thu May 01 00:00:00 EDT 1980
· Chem. Eng. Prog.; (United States)
·
OSTI ID:6150056
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200202* -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
CALCULATION METHODS
CAPITALIZED COST
CHEMICAL REACTIONS
CHIYODA THOROUGHBRED PROCESS
COMPUTER CODES
COST
COST ESTIMATION
DESULFURIZATION
ECONOMICS
EQUIPMENT
FLUE GAS
FOSSIL-FUEL POWER PLANTS
GASEOUS WASTES
LIME-LIMESTONE WET SCRUBBING PROCESSES
OPERATING COST
OXIDATION
POLLUTION CONTROL EQUIPMENT
POWER PLANTS
R CODES
RETROFITTING
SCRUBBERS
SCRUBBING
SPRAYS
THERMAL POWER PLANTS
W-L SULFUR DIOXIDE RECOVERY PROCESS
WASTES
200202* -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
CALCULATION METHODS
CAPITALIZED COST
CHEMICAL REACTIONS
CHIYODA THOROUGHBRED PROCESS
COMPUTER CODES
COST
COST ESTIMATION
DESULFURIZATION
ECONOMICS
EQUIPMENT
FLUE GAS
FOSSIL-FUEL POWER PLANTS
GASEOUS WASTES
LIME-LIMESTONE WET SCRUBBING PROCESSES
OPERATING COST
OXIDATION
POLLUTION CONTROL EQUIPMENT
POWER PLANTS
R CODES
RETROFITTING
SCRUBBERS
SCRUBBING
SPRAYS
THERMAL POWER PLANTS
W-L SULFUR DIOXIDE RECOVERY PROCESS
WASTES