Outage management philosophies at Oconee nuclear station
Conference
·
· Transactions of the American Nuclear Society; (United States)
OSTI ID:5981994
- Duke Power Co., Seneca, SC (United States)
At Oconee the biggest single factor in improving availability and cutting cost per kilowatt-hour is reducing outage lengths. This must be accomplished without compromising the quality of the work that must be performed during these outages. Oconee has completed 35 refueling outages and has gained considerable experience in outage management. Since 1984, outage costs and durations have consistently been reduced while continuing to improve capacity factors. The last 6 refueling outages were 43, 42, 45, 42, 41, and 44 days, respectively. The capacity factors for these units between refueling outages are 98, 94, 96, 98, and 98%, respectively. The average cost of outages has been less than $12 million. It is believed that success cannot be attributed to any one factor by itself but is a compilation of many factors, all complementing each other. It is also believed, however, that there are four key areas that represent philosophies and can be given most of the credit for successful outages: planning, experience, teamwork, and outage management.
- OSTI ID:
- 5981994
- Report Number(s):
- CONF-910603--
- Conference Information:
- Journal Name: Transactions of the American Nuclear Society; (United States) Journal Volume: 63
- Country of Publication:
- United States
- Language:
- English
Similar Records
Integrated outages increase Surry's availability
Procedures and equipment for shortening refueling outages in Babcock and Wilcox PWRs. Final report
Containing operating and maintenance expenses at Oconee Nuclear Station
Journal Article
·
Tue Jan 31 23:00:00 EST 1995
· Power Engineering; (United States)
·
OSTI ID:6501132
Procedures and equipment for shortening refueling outages in Babcock and Wilcox PWRs. Final report
Technical Report
·
Sun Mar 31 23:00:00 EST 1985
·
OSTI ID:5920548
Containing operating and maintenance expenses at Oconee Nuclear Station
Conference
·
Sun Dec 31 23:00:00 EST 1989
· Transactions of the American Nuclear Society; (United States)
·
OSTI ID:6782402
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210200* -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
AVAILABILITY
BOILERS
CONSTRUCTION
CONTROL EQUIPMENT
COOLING SYSTEMS
DECISION MAKING
ECONOMICS
EDDY CURRENT TESTING
ELECTRIC UTILITIES
ELECTRICAL EQUIPMENT
ELECTROMAGNETIC TESTING
ENRICHED URANIUM REACTORS
EQUIPMENT
FLOW REGULATORS
INSPECTION
MAINTENANCE
MANAGEMENT
MATERIALS TESTING
MODIFICATIONS
NONDESTRUCTIVE TESTING
OCONEE-1 REACTOR
OCONEE-2 REACTOR
OCONEE-3 REACTOR
OPERATION
PLANNING
POWER REACTORS
PRIMARY COOLANT CIRCUITS
PUBLIC UTILITIES
PUMPS
PWR TYPE REACTORS
REACTOR COMPONENTS
REACTOR COOLING SYSTEMS
REACTOR FUELING
REACTOR MAINTENANCE
REACTOR OPERATION
REACTORS
SCHEDULES
SECONDARY COOLANT CIRCUITS
STEAM GENERATORS
TESTING
THERMAL REACTORS
TUBES
VALVES
VAPOR GENERATORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210200* -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
AVAILABILITY
BOILERS
CONSTRUCTION
CONTROL EQUIPMENT
COOLING SYSTEMS
DECISION MAKING
ECONOMICS
EDDY CURRENT TESTING
ELECTRIC UTILITIES
ELECTRICAL EQUIPMENT
ELECTROMAGNETIC TESTING
ENRICHED URANIUM REACTORS
EQUIPMENT
FLOW REGULATORS
INSPECTION
MAINTENANCE
MANAGEMENT
MATERIALS TESTING
MODIFICATIONS
NONDESTRUCTIVE TESTING
OCONEE-1 REACTOR
OCONEE-2 REACTOR
OCONEE-3 REACTOR
OPERATION
PLANNING
POWER REACTORS
PRIMARY COOLANT CIRCUITS
PUBLIC UTILITIES
PUMPS
PWR TYPE REACTORS
REACTOR COMPONENTS
REACTOR COOLING SYSTEMS
REACTOR FUELING
REACTOR MAINTENANCE
REACTOR OPERATION
REACTORS
SCHEDULES
SECONDARY COOLANT CIRCUITS
STEAM GENERATORS
TESTING
THERMAL REACTORS
TUBES
VALVES
VAPOR GENERATORS
WATER COOLED REACTORS
WATER MODERATED REACTORS