Partial fixes over a period of time were insufficient to meet cooling requirements at this four-tower powerplant. The eventual remedy involved complete fill replacement and chemistry-program revision. Cooling-tower performance hinges on many factors. Assuming the proper water and air distribution and unhindered operation of spray nozzles, pumps, valves, etc, fill design is the key element. However, a decade of experience at Keystone station (operated by Pennsylvania Electric Co for a consortium of East Coast utilities) showed that more than just changing to a fouling-resistant fill was required to provide and maintain design performance. As described in this article, careful analysis, revision, and continuous monitoring of the chemical water-treatment program were needed as well. At each of Keystone's two units, two natural-draft, hyperbolic towers provide cooling for main-condenser circulating water and service water. The 325-ft-tall towers are counter-current flow, and measure 247 ft across the basin. Film-type fill originally installed in the towers consisted of assemblies of fiber-cement board, 9 ft deep in the center and 7 ft in the peripheral regions. Fiber-cement was also the construction material used in the drift eliminators, and in the piping connected to concrete distribution flumes within the towers.
- OSTI ID:
- 5976243
- Journal Information:
- Power; (United States), Journal Name: Power; (United States) Vol. 137:2; ISSN POWEAD; ISSN 0032-5929
- Country of Publication:
- United States
- Language:
- English
Similar Records
Keystone station cooling tower fill fouling
Pilot scale cooling tower fouled fill treatment: AFCATT (Anti-Fouling Chemical Additive Test Tower)
AFCATT (Anti-Fouling Chemical Additive Test Tower)
Conference
·
Tue Dec 31 23:00:00 EST 1991
· Proceedings of the American Power Conference; (United States)
·
OSTI ID:7239544
Pilot scale cooling tower fouled fill treatment: AFCATT (Anti-Fouling Chemical Additive Test Tower)
Technical Report
·
Tue Jan 31 23:00:00 EST 1995
·
OSTI ID:48142
AFCATT (Anti-Fouling Chemical Additive Test Tower)
Technical Report
·
Thu Jun 01 00:00:00 EDT 1995
·
OSTI ID:121538