Proposed Norton-Tesuque 115 kV overhead transmission line and substation in Sante Fe, New Mexico

Technical Report ·
OSTI ID:5965968
Construction is proposed of a 115/12.5-kilovolt (kV), 10/12.5-megavolt-ampere (MVA) substation in the Tesuque area and of 9.02 miles of 115-kV overhead transmission line from the Norton Station to the new substation in an area approximately three miles north of Sante Fe, New Mexico. The project would involve the granting of a 100-foot width right-of-way by the Tesuque Pueblo, the construction of the substation on the Tesuque Pueblo Indian Reservation between the Rio Tesuque and New Mexico 85, the addition of a 115-kV breaker bay at Norton Station, and the installation of two underground 12.47-kV distribution feeders to connect to existing ones in the Tesuque area. In addition, the station would be designed to accommodate one future underground 12.47-kV feeder that would terminate at a future distribution line in the Tesuque area. The preferred transmission line route would originate at the Norton Station and proceed east-northeast up Calabasa Arroyo to a point approximately 1.1 miles north of the southwest corner of the Tesuque Pueblo boundary. From this point the route would proceed east to the proposed substation site.
Research Organization:
Bureau of Indian Affairs, Albuquerque, NM (USA)
OSTI ID:
5965968
Report Number(s):
EIS-85-0349(Final)
Country of Publication:
United States
Language:
English