Single and dual lift analyses of offshore structures
Conference
·
· Soc. Pet. Eng. AIME, Pap.; (United States)
OSTI ID:5957531
At offshore job sites today, decks are lifted onto jacket structures in relatively large, heavy sections. Since lifting operations are greatly affected by the motions of the derrick barge or the crane ship, it is necessary to evaluate the sling system in consideration of vessel motions in order to regulate lifting operations at the job site. This paper proposes a static analysis method for designing sling systems and describes the application of this method to dual-lift operations carried out by two derrick crane barges in Southeast Asian waters. This paper also presents the methods of analyzing the motions of a hoisted load caused by wave-induced vessel motions and resulting dynamic sling tensions in single- and dual-lift operations. Single-lift, unified analysis -- a method that considers the interaction between the barge and the hoisted load -- is discussed, and calculated results are compared with 1/75-scale model test results to clarify the conditions necessary for unified analysis. Finally, the results of transient motion analysis for a barge crawling while lifting a load are compared with model test results.
- Research Organization:
- Nippon Steel Corporation Sagamihara R and E Center
- OSTI ID:
- 5957531
- Report Number(s):
- CONF-8402115-
- Conference Information:
- Journal Name: Soc. Pet. Eng. AIME, Pap.; (United States) Journal Volume: SPE 12419
- Country of Publication:
- United States
- Language:
- English
Similar Records
Motion characteristics of crane vessels in lifting operation
Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations
Production platform lost in storm is picked up from 330 ft of water
Conference
·
Sun May 01 00:00:00 EDT 1983
· Offshore Technol. Conf.; (United States)
·
OSTI ID:5412056
Method and apparatus for the offshore installation of multi-ton prefabricated deck packages on partially submerged offshore jacket foundations
Patent
·
Mon Dec 21 23:00:00 EST 1987
·
OSTI ID:5451868
Production platform lost in storm is picked up from 330 ft of water
Journal Article
·
Fri Oct 01 00:00:00 EDT 1971
· Offshore; (United States)
·
OSTI ID:5444725
Related Subjects
02 PETROLEUM
020300* -- Petroleum-- Drilling & Production
03 NATURAL GAS
030300 -- Natural Gas-- Drilling
Production
& Processing
BARGES
CRANES
DYNAMIC LOADS
EQUIPMENT
HOISTING
MATERIALS HANDLING
MATERIALS HANDLING EQUIPMENT
MOTION
OFFSHORE PLATFORMS
PERFORMANCE TESTING
SCALE MODELS
SHIPS
STRUCTURAL MODELS
TESTING
WAVE FORCES
020300* -- Petroleum-- Drilling & Production
03 NATURAL GAS
030300 -- Natural Gas-- Drilling
Production
& Processing
BARGES
CRANES
DYNAMIC LOADS
EQUIPMENT
HOISTING
MATERIALS HANDLING
MATERIALS HANDLING EQUIPMENT
MOTION
OFFSHORE PLATFORMS
PERFORMANCE TESTING
SCALE MODELS
SHIPS
STRUCTURAL MODELS
TESTING
WAVE FORCES