skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cost estimate of grouting the proposed test pits at Idaho National Engineering Laboratory using the ORNL-recommended grouts

Technical Report ·
DOI:https://doi.org/10.2172/5940928· OSTI ID:5940928

EG and G Idaho will construct three experimental pits to simulate the TRU waste trenches at Idaho National Engineering Laboratory (INEL). Two of these pits will be grouted and then one will be destructively examined as soon as the grout cures and the other will be monitored for 10 years. Oak Ridge National Laboratory (ORNL) is evaluating grouts and will recommend a grout to EG and G Idaho to reduce the permeability of the pit, fill the large voids, and encapsulate the waste. A previous ORNL report (ORNL/TM-9881) discusses the grouts evaluated and the grout recommended based on those evaluations. This report evaluates the economics of grouting the experimental pits. The cost of double grouting two of the EG and G Idaho design pits at the Idaho National Engineering Laboratory using lance injection was estimated to be $100,000. Jet grouting the same two pits was estimated to cost $85,000. Both should be tried as part of the test EG and G Idaho is conducting.

Research Organization:
Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
5940928
Report Number(s):
ORNL/TM-10025; ON: DE88000028; TRN: 87-036502
Resource Relation:
Other Information: Portions of this document are illegible in microfiche products. Original copy available until stock is exhausted
Country of Publication:
United States
Language:
English