PRA (Probabilistic Risk Assessment) Applications Program for inspection at Oconee Unit 3
Technical Report
·
OSTI ID:5933447
The extensive Oconee-3 PRA performed by EPRI has been analyzed to identify plant systems and components important to minimizing public risk, and to identify the primary failure modes of these components. This information has been tabulated, and correlated with inspection modules from the NRC Inspection and Enforcement Manual. The report presents a series of tables, organized by system and prioritized by public risk (in person-rem per year), which identify components associated with 98% of the inspectable risk due to plant operation. External events (earthquakes, tornadoes, fires and floods) are not addressed because inspections cannot directly minimize the risks from these events; however, flooding caused by the breach of internal systems is addressed. The systems addressed, in descending order of risk importance, are: Reactor Building Spray, R B Cooling, Condenser Circulating Water, Safety Relief Valves, Low Pressure Injection, Standby Shutdown Facility-High Pressure Injection, Low-Pressure Service Water, and Emergency Feedwater. This ranking is based on the Fussel-Vesely measure of risk importance, i.e., the fraction of the total risk which involves failures of the system of interest. 8 refs., 25 tabs.
- Research Organization:
- Pacific Northwest Lab., Richland, WA (USA); Nuclear Regulatory Commission, King of Prussia, PA (USA). Region I
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 5933447
- Report Number(s):
- NUREG/CR-5006; ON: DE88001343
- Country of Publication:
- United States
- Language:
- English
Similar Records
PRA Applications Program for inspection at Arkansas Nuclear One, Unit 1
Methodology and application of surrogate plant PRA analysis to the Rancho Seco Power Plant: Task 1, Analysis of ANO-1 and Oconee PRAs
PRA (probabilistic risk assessment) applications program for inspection at Calvert Cliffs Unit 1 Nuclear Power Plant
Technical Report
·
Mon Feb 29 23:00:00 EST 1988
·
OSTI ID:5155156
Methodology and application of surrogate plant PRA analysis to the Rancho Seco Power Plant: Task 1, Analysis of ANO-1 and Oconee PRAs
Technical Report
·
Wed Jul 01 00:00:00 EDT 1987
·
OSTI ID:6439111
PRA (probabilistic risk assessment) applications program for inspection at Calvert Cliffs Unit 1 Nuclear Power Plant
Technical Report
·
Thu Jun 01 00:00:00 EDT 1989
·
OSTI ID:5910160
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
22 GENERAL STUDIES OF NUCLEAR REACTORS
220900* -- Nuclear Reactor Technology-- Reactor Safety
ACCIDENTS
ATWS
CONTROL EQUIPMENT
ENGINEERED SAFETY SYSTEMS
ENRICHED URANIUM REACTORS
EQUIPMENT
FAILURES
FLOW REGULATORS
INSPECTION
LOSS OF COOLANT
OCONEE-3 REACTOR
PIPES
POWER REACTORS
PROBABILISTIC ESTIMATION
PUMPS
PWR TYPE REACTORS
REACTOR ACCIDENTS
REACTOR SAFETY
REACTORS
RISK ASSESSMENT
SAFETY
TRANSIENTS
VALVES
WATER COOLED REACTORS
WATER MODERATED REACTORS
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
22 GENERAL STUDIES OF NUCLEAR REACTORS
220900* -- Nuclear Reactor Technology-- Reactor Safety
ACCIDENTS
ATWS
CONTROL EQUIPMENT
ENGINEERED SAFETY SYSTEMS
ENRICHED URANIUM REACTORS
EQUIPMENT
FAILURES
FLOW REGULATORS
INSPECTION
LOSS OF COOLANT
OCONEE-3 REACTOR
PIPES
POWER REACTORS
PROBABILISTIC ESTIMATION
PUMPS
PWR TYPE REACTORS
REACTOR ACCIDENTS
REACTOR SAFETY
REACTORS
RISK ASSESSMENT
SAFETY
TRANSIENTS
VALVES
WATER COOLED REACTORS
WATER MODERATED REACTORS