Selenide isotope generator for the Galileo Mission. Program final report

Technical Report ·
DOI:https://doi.org/10.2172/5928964· OSTI ID:5928964
This final report for the Selenide Isotope Generator for the Galileo Mission (SIG/GM) documents the work performed by Teledyne Energy Systems (TES) under US Department of Energy (DOE) Contract No. DE-AC01-78ET33009 (formerly ET-78-C-01-2865) during the period April 10, 1978 to June 30, 1979. Because of technical difficulties with the thermoelectric converter being developed by the 3M Company under separate DOE contract, a Stop Work Order, dated January 29, 1979, was issued by DOE. The TES effort up to the receipt of the Stop Work Order as well as limited technical activities up to the contract conclusion on June 30, 1979 are reported.
Research Organization:
Teledyne Energy Systems, Timonium, MD (USA)
OSTI ID:
5928964
Report Number(s):
TES-33009-46
Country of Publication:
United States