Evaluation of locations for a 50-MW wood-fired power plant in northern Vermont
Technical Report
·
OSTI ID:5922778
The study examined 11 towns in Vermont for their suitability as locations for wood-fired power plants. The criteria used included: (1) wood supply; (2) transportation systems; (3) power marketing; (4) water source; (5) air quality; (6) other environmental factors; and (7) socio-economic conditions. (TFD)
- Research Organization:
- Dartmouth Coll., Hanover, NH (USA). Thayer School of Engineering
- OSTI ID:
- 5922778
- Report Number(s):
- DSD-115
- Country of Publication:
- United States
- Language:
- English
Similar Records
Feasibility of operating a 50-MW wood-fired power plant in northern Vermont: wood availabiity and siting potential. Executive summary
Availability of wood for a 50-MW wood-fired power plant in northern Vermont
Electric power from Vermont wood
Technical Report
·
Thu Jun 01 00:00:00 EDT 1978
·
OSTI ID:5715706
Availability of wood for a 50-MW wood-fired power plant in northern Vermont
Technical Report
·
Thu Jun 01 00:00:00 EDT 1978
·
OSTI ID:5715718
Electric power from Vermont wood
Journal Article
·
Sun Dec 31 23:00:00 EST 1978
· North. Logger; (United States)
·
OSTI ID:6981007