Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Solar pilot plant, Phase 1. Quarterly report No. 6, January-March 1977

Technical Report ·
OSTI ID:5912126
Study of the technical and economic feasibility of a tower focus power plant is reported. The pilot plant and its major subsystems are described. The collector Subsystem Research Experiment (SRE) is reported completed, and the system and tests are described. The steam generator SRE and test facility are described and the status of its testing is given. The sensible heat storage subsystem that has been incorporated in the pilot plant design is described, including optimization, heat losses, tanks, heat exchanger, and oil maintenance unit. Concepts for closing the steam generator housing aperture of the cavity receiver are described and some seismic calculations are made. The electrical generation and plant control subsystems are discussed. Cold plant startup and shutdown sequences are appended. (LEW)
Research Organization:
Honeywell, Inc., Minneapolis, MN (USA). Energy Resources Center
DOE Contract Number:
AC03-76SF11109
OSTI ID:
5912126
Report Number(s):
DOE/SF/11109-T12; SAN-1109-77-6; ON: DE82004241
Country of Publication:
United States
Language:
English