Title: Pretest analysis document for Semiscale Test S-FS-1

Technical Report ·
OSTI ID:5906872

This report documents the pretest analysis calculation completed with the RELAP5/MOD2/CY21 code for Semiscale Test S-FS-1. The test will simulate the double-ended offset shear of the main steam line at the exit of the broken loop steam generator (downstream of the flow restrictor) and the subsequent plant recovery. The recovery portion of the test consists of a plant stabilization phase and a plant cooldown phase. The recovery procedures involve normal charging/letdown operation, pressurizer heater operation, secondary steam and feed of the unaffected steam generator, and pressurizer auxiliary spray. The test will be terminated after the unaffected steam generator and pressurizer pressures and liquid levels are stable, and the average priamry fluid temperature is stable at about 480 K (405/sup 0/F) for at least 10 minutes.

Research Organization:
EG and G Idaho, Inc., Idaho Falls (USA)
DOE Contract Number:
AC07-76ID01570
OSTI ID:
5906872
Report Number(s):
EGG-SEMI-6809; ON: TI85008646
Country of Publication:
United States
Language:
English