Pretest analysis document for Semiscale Test S-FS-1
This report documents the pretest analysis calculation completed with the RELAP5/MOD2/CY21 code for Semiscale Test S-FS-1. The test will simulate the double-ended offset shear of the main steam line at the exit of the broken loop steam generator (downstream of the flow restrictor) and the subsequent plant recovery. The recovery portion of the test consists of a plant stabilization phase and a plant cooldown phase. The recovery procedures involve normal charging/letdown operation, pressurizer heater operation, secondary steam and feed of the unaffected steam generator, and pressurizer auxiliary spray. The test will be terminated after the unaffected steam generator and pressurizer pressures and liquid levels are stable, and the average priamry fluid temperature is stable at about 480 K (405/sup 0/F) for at least 10 minutes.
- Research Organization:
- EG and G Idaho, Inc., Idaho Falls (USA)
- DOE Contract Number:
- AC07-76ID01570
- OSTI ID:
- 5906872
- Report Number(s):
- EGG-SEMI-6809; ON: TI85008646
- Country of Publication:
- United States
- Language:
- English
Similar Records
Pretest analysis document for Test S-FS-11
Pretest analysis document for Test S-FS-7
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
PWR TYPE REACTORS
REACTOR ACCIDENTS
STEAM LINES
HEAT TRANSFER
HYDRAULICS
FAILURES
FEEDWATER
FLOW RATE
PRESSURE GRADIENTS
REACTOR SAFETY
TEMPERATURE GRADIENTS
TEST FACILITIES
ACCIDENTS
ENERGY TRANSFER
FLUID MECHANICS
HYDROGEN COMPOUNDS
MECHANICS
OXYGEN COMPOUNDS
REACTORS
SAFETY
WATER
WATER COOLED REACTORS
WATER MODERATED REACTORS
220900* - Nuclear Reactor Technology- Reactor Safety
210200 - Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled