Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

10 MWe Solar Thermal Central Receiver Pilot Plant: 1984 summer solstice power production test

Technical Report ·
DOI:https://doi.org/10.2172/5885607· OSTI ID:5885607

The 1984 summer solstice power production test for the 10 MWe Solar Thermal Central Receiver Pilot Plant near Barstow, California, was conducted June 14 to 28, 1984. This report presents the actual operating parameters and results of the test, compares those parameters and results to the plant's original design point conditions, and analyzes the differences.

Research Organization:
Sandia National Labs., Livermore, CA (USA)
DOE Contract Number:
AC04-76DR00789
OSTI ID:
5885607
Report Number(s):
SAND85-8216; ON: DE85012588
Country of Publication:
United States
Language:
English