Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Fuel assembly cooling experience at the FFTF IEM cell

Conference · · Trans. Am. Nucl. Soc.; (United States)
OSTI ID:5859994
To date, 13 fuel assemblies requiring forced cooling have been processed through the Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell. Of these, two assemblies experienced overtemperature conditions due to inadequate forced cooling. Both of the occurrences have contributed significantly to the process of learning how to operate a fuel assembly cooling system remotely in an argon atmosphere hot cell. Many innovations have been made to the cooling system to enhance safety and increase productivity, and are briefly described.
Research Organization:
Westinghouse Hanford Company, Richland, WA
OSTI ID:
5859994
Report Number(s):
CONF-851115-
Conference Information:
Journal Name: Trans. Am. Nucl. Soc.; (United States) Journal Volume: 50
Country of Publication:
United States
Language:
English