Reconnaissance report for hydropower, Lock and Dam number 2, Mississippi River. Preliminary report
Technical Report
·
OSTI ID:5840293
This report presents a preliminary evaluation of the addition of hydropower at the existing navigation Lock and Dam 2. The study shows that installation of a hydroplant with a 4,000-kW (kilowatt) or 5,000-kW nameplate rating is economical. Pertinent data concerning the site and two optional installations are given. Severe environmental impacts do not appear to be associated with construction of a plant of the sizes investigated. The District Engineer recommends that the Corps of Engineers prepare a feasibility report which can serve as a basis for congressional authorization for hydropower plant construction at Lock and Dam 2.
- Research Organization:
- Corps of Engineers, St. Paul, MN (USA). St. Paul District
- OSTI ID:
- 5840293
- Report Number(s):
- AD-A-129836/3
- Country of Publication:
- United States
- Language:
- English
Similar Records
Reconnaissance report for hydropower, Lock and Dam 8, Mississippi River. Preliminary report
Lock and Dam 5, Mississippi River near Minneiska, Minnesota, Reconnaissance report for hydropower. Preliminary report
Lock and Dam 1, Mississippi River, Minneapolis - St. Paul, Minnesota. Reconnaissance report for hydropower. Preliminary report
Technical Report
·
Tue Sep 01 00:00:00 EDT 1981
·
OSTI ID:5848844
Lock and Dam 5, Mississippi River near Minneiska, Minnesota, Reconnaissance report for hydropower. Preliminary report
Technical Report
·
Tue Sep 01 00:00:00 EDT 1981
·
OSTI ID:5570877
Lock and Dam 1, Mississippi River, Minneapolis - St. Paul, Minnesota. Reconnaissance report for hydropower. Preliminary report
Technical Report
·
Tue Sep 01 00:00:00 EDT 1981
·
OSTI ID:5624731