Reconnaissance report for hydropower, Lock and Dam number 2, Mississippi River. Preliminary report

Technical Report ·
OSTI ID:5840293
This report presents a preliminary evaluation of the addition of hydropower at the existing navigation Lock and Dam 2. The study shows that installation of a hydroplant with a 4,000-kW (kilowatt) or 5,000-kW nameplate rating is economical. Pertinent data concerning the site and two optional installations are given. Severe environmental impacts do not appear to be associated with construction of a plant of the sizes investigated. The District Engineer recommends that the Corps of Engineers prepare a feasibility report which can serve as a basis for congressional authorization for hydropower plant construction at Lock and Dam 2.
Research Organization:
Corps of Engineers, St. Paul, MN (USA). St. Paul District
OSTI ID:
5840293
Report Number(s):
AD-A-129836/3
Country of Publication:
United States
Language:
English